Preferred Schematic Report (PSR)
TMS PSR Section 3.3.1 Introduction
TMS PSR Section 3.3.2 Evaluation of Existing Conditions
TMS PSR Section 3.3.3 Final Evaluation of Alternatives
TMS PSR Section 3.3.4 Preferred Solution
TMS PSR Section 3.3.5 Local Actions and Approvals
TMS PSR Appendix 3.3.6.1 TMSBC Meeting Minutes
TMS PSR Appendix 3.3.6.2 Project Schedule
TMS PSR Appendix 3.3.6.3 Limited Soil Report
TMS PSR Appendix 3.3.6.4 Foundation Report
TMS PSR Appendix 3.3.6.5 HazMat Report
TMS PSR Appendix 3.3.6.6 Hydrant Flow Test
TMS PSR Appendix 3.3.6.7 Environmental Site
TMS PSR Appendix 3.3.6.8 Topographic Plan
TMS PSR Appendix 3.3.6.9 Traffic Analysis
TMS PSR Appendix 3.3.6.10 PSR Cost Estimate
TMS PSR Appendix 3.3.6.11 Probable-Comparable Cost Analysis
TMS PSR Appendix 3.3.6.12 Educational Program