Tyngsborough Middle School Construction Project
  • Home
  • Project Team▼
    Project Team▼
    • Who We Are
    • Building Committee
    • Owner's Project Manager
    • Designer
    • MSBA
  • FAQ's
  • Documents▼
    Documents▼
    • Glossary of Key Terms
    • Feasibility Study Agrmt.
    • Statement of Interest
  • Agendas, Minutes, Reports
  • Project Timeline▼
    Project Timeline▼
    • MSBA Process
    • Project Milestones
    • Conceptual Schedule
  • MSBA Submissions▼
    MSBA Submissions▼
    • Prelim. Design Program
    • Preferred Schematic Rpt.
    • Schematic Design
    • Design Development
    • 60% CD
    • 90% CD
    • 100% CD
  • Renderings

Preliminary Design Program (PDP)

TMS PDP 3.1 Table of Contents

TMS PDP 3.1.1 Introduction

TMS PDP 3.1.2 Educational Program

TMS PDP 3.1.3 Initial Space Summary

TMS PDP 3.1.4 Evaluation of Existing Conditions

TMS PDP 3.1.5 Site Development Requirements

TMS PDP 3.1.6 Preliminary Evaluation of Alternatives

TMS PDP 3.1.7 Local Actions and Approvals

TMS PDP 3.1.8.1 Statement of Interest 

TMS PDP 3.1.8.2 MSBA Board Action Letter - Invitation to Feasibility

TMS PDP 3.1.8.3 Design Enrollment Certification Letter

TMS PDP 3.1.8.4 Capital Budget Statement

TMS PDP 3.1.8.5 Project Directory

TMS PDP 3.1.8.6 Project Schedule

TMS PDP 3.1.8.7 Educational Visioning Workshop Notes

TMS PDP 3.1.8.8 MHC Project Notification Form

TMS PDP 3.1.8.9 Property Deeds

TMS PDP 3.1.8.10 Tyngsborough Middle School Building Committee Meeting Minutes

TMS PDP 3.1.8.11 Designer Meeting Minutes

TMS PDP 3.1.8.12 Comparative Probable Cost Analysis

TMS PDP 3.1.8.13 Project LEED Registration

 

 

Tyngsborough Middle School Construction Project
  • Home
  • | Project Team ▲
    Project Team ▲
    • Who We Are
    • Building Committee
    • Owner's Project Manager
    • Designer
    • MSBA
  • | FAQ's
  • | Documents ▲
    Documents ▲
    • Glossary of Key Terms
    • Feasibility Study Agrmt.
    • Statement of Interest
  • | Agendas, Minutes, Reports
  • | Project Timeline ▲
    Project Timeline ▲
    • MSBA Process
    • Project Milestones
    • Conceptual Schedule
  • | MSBA Submissions ▲
    MSBA Submissions ▲
    • Prelim. Design Program
    • Preferred Schematic Rpt.
    • Schematic Design
    • Design Development
    • 60% CD
    • 90% CD
    • 100% CD
  • | Renderings
Powered by ZENFOLIO User Agreement
Cancel
Continue